This greenfield, pyrometallurgical facility will comprise a 60,000-t/yr ferronickel smelter for the extraction of nickel from saprolitic ore mined from the Koniambo ore body. Koniambo is one of the world's largest and highest-grade undeveloped nickel laterite deposits.
More about Koniambo Ferronickel >

Hatch designed and supplied the complete smelting system which included calcine transfer and feed system and a 94-WM/120-MVA furnace, complete with power supply. This Hatch ferronickel furnace will have the highest power rating and production capacity in the world.
More about SNNC Ferronickel Furnace >

The work was principally comprised of replacing the Peirce-Smith converters with Ausmelt process technology. The intention was to achieve the highest environmental standards for sulphur dioxide capture.
More about ACP Stage A >

The project included a standby platinum-converting furnace with associated ancillaries. The
standby converter wa integral to Anglo Platinum’s sustained platinum production as the entire converting capability was
routed through the single ACP plant.
More about ACP Stage B >