Authors: K. Major, P. Lefebvre, D. Turk, J. Sargent
Abstract
Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1995 with the replacement of the ball mill and the addition of flotation capacity to increase mill throughput to 1820 t/d (2000 stpd).
The applications for platinum and palladium have increased in recent years particularly in the automotive industry and the supply of the metals has remained fairly constant with prices for both platinum and palladium increasing and remaining very stable. In 1997 Stillwater initiated the expansion of their operations to increase production of platinum and palladium. Projects were initiated to expand production at the Nye operations, increase smelter and refining capacities at the Columbus facilities and to develop the extension of the orebody at the East Boulder site.
This paper will discuss the changes at the Nye concentrator which were completed to increase production from 1820 t/d (2000 stpd) to 2730 t/d (3000 stpd) and eliminate some of the process bottlenecks.